Ogreeno Alley Assigned to Planner; Porous Design to Reduce Flooding

Summary


Less water should flood properties near HaynieOs Corner after city officials have a nearby alley repaved with a permeable material.

The Evansville Redevelopment Commission agreed Wednesday to hire the local architecture firm Hafer Associates to redesign an alleyway that runs through Goosetown Park between Southeast Second and Putnam streets. The alleyOs pavement is composed of brick and is to be replaced with a material allowing rainwater to seep into the ground rather than pool on the surface.

See the full content of this document

Extract


Ogreeno Alley Assigned to Planner; Porous Design to Reduce Flooding

Justin OJesseO Knight, who lives on Adams Avenue near the alley, ...

See the full content of this document

Sponsored links




ver las páginas en versión mobile | web

ver las páginas en versión mobile | web

© Copyright 2012, vLex. All Rights Reserved.

Contents in vLex United States

Explore vLex

For Professionals

For Partners

Company